Lean Manufacturing

Introduction

Indian factories compete on cost and flexibility, yet waste continues to swallow 20–30 % of value. Lean Manufacturing training equips teams to identify and eliminate the seven classic wastes—transport, inventory, motion, waiting, over-production, over-processing, and defects—releasing capacity without capital spend.

Program Goals

  • Build a continuous-improvement mind-set across operators and supervisors.
  • Reduce lead time and inventory while raising productivity and safety.
  • Create visual management systems that sustain gains.

Three-Day Intensive Format

DayFocusOn-Floor Exercise
1Lean Principles & 5SRed-tag campaign in one zone
2Value-Stream Mapping & KaizenMap current vs future state of a pilot product
3Pull Systems & Standard WorkDesign Kanban loop, create standard work sheet

Essential Toolkits (Take-Home)

  • 5S audit sheet with colour-coded scoring.
  • VSM template (A3 size).
  • Kaizen newspaper board.
  • Standard work combination chart.
  • Kanban card generator (Excel).

Benefits & Target KPIs

KPIBaseline90-Day Target
Floor space utilization70 %85 %
WIP days of cover22≤ 12
First-pass yield89 %≥ 96 %
5S audit score55/100≥ 80/100

Success Story

A Gujarat textile mill implemented 5S and single-piece flow on its winding line, reducing changeover time by 43 % and freeing 1 000 sq ft of space which they repurposed for a sampling cell generating ₹1.2 crore additional revenue annually.

FAQs

How many employees can join?

One core team of 15–20 runs the pilot; knowledge then cascades through train-the-trainer.

Will output drop during the course?

A short dip on Day 1 is common; by Day 3 pilot cells usually exceed previous output.

Do you supply labels and boards?

Starter kits with red tags, floor tape, and shadow boards are included.

Is lean only for high-volume lines?

No—job shops and process industries benefit equally through layout and batch-size optimisation.

WhatsApp us