Lean Manufacturing
Introduction
Indian factories compete on cost and flexibility, yet waste continues to swallow 20–30 % of value. Lean Manufacturing training equips teams to identify and eliminate the seven classic wastes—transport, inventory, motion, waiting, over-production, over-processing, and defects—releasing capacity without capital spend.
Program Goals
- Build a continuous-improvement mind-set across operators and supervisors.
- Reduce lead time and inventory while raising productivity and safety.
- Create visual management systems that sustain gains.
Three-Day Intensive Format
| Day | Focus | On-Floor Exercise |
|---|---|---|
| 1 | Lean Principles & 5S | Red-tag campaign in one zone |
| 2 | Value-Stream Mapping & Kaizen | Map current vs future state of a pilot product |
| 3 | Pull Systems & Standard Work | Design Kanban loop, create standard work sheet |
Essential Toolkits (Take-Home)
- 5S audit sheet with colour-coded scoring.
- VSM template (A3 size).
- Kaizen newspaper board.
- Standard work combination chart.
- Kanban card generator (Excel).
Benefits & Target KPIs
| KPI | Baseline | 90-Day Target |
|---|---|---|
| Floor space utilization | 70 % | 85 % |
| WIP days of cover | 22 | ≤ 12 |
| First-pass yield | 89 % | ≥ 96 % |
| 5S audit score | 55/100 | ≥ 80/100 |
Success Story
A Gujarat textile mill implemented 5S and single-piece flow on its winding line, reducing changeover time by 43 % and freeing 1 000 sq ft of space which they repurposed for a sampling cell generating ₹1.2 crore additional revenue annually.
FAQs
How many employees can join?
One core team of 15–20 runs the pilot; knowledge then cascades through train-the-trainer.
Will output drop during the course?
A short dip on Day 1 is common; by Day 3 pilot cells usually exceed previous output.
Do you supply labels and boards?
Starter kits with red tags, floor tape, and shadow boards are included.
Is lean only for high-volume lines?
No—job shops and process industries benefit equally through layout and batch-size optimisation.
